My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (229)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (229)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:05:53 AM
Creation date
6/19/2012 2:58:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 1999 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> and disposal of remaining structures,access road reclamation, completion of highwall <br /> baekfi ffing,removal of two large culvcrts in Dutch Creek and in the North Fork of Dutch <br /> Creek, and revegetation. <br /> In the Facilities Area, the coal refuse placed over the demolished concrete in the former <br /> wash plant area will be covered by a"sub soil" and will then be topsoiled. Structures will be <br /> removed and disposed of. Access roads at the Sutey refuse area will be eliminated in some <br /> instances,while in others the roads will be reduced in size and configured to shed water in a <br /> non-erosive and maintenance-free manner_ A drainage ditch will be established from new <br /> the top of the Old Refuse Pile to its base to convey runoff from the pile to creek level. <br /> Topsoil will then be applied to almost all of the areas affected by this project, except road <br /> surfaces needed for access. <br /> Pond Removal Project <br /> Originally,the Division planned to remove all ponds at the site. However, after consultation <br /> with the U_S.Forest Service, the plan now is to convert the ponds into wetlands. <br /> Road Reclamation Project <br /> Roads A, $, C, and D still need to be reclaimed After consultation with the Forest Service, <br /> the Divisions plans to reclaim these roads similar to the reclamation done in 1996 on Roads E, <br /> F,and 0. <br /> In addition to the above projects,a limited amount of mine maintenance will be done and <br /> some tree planting will also be accomplished. <br /> I hope this summary is helpful to you. 1f you have any questions,please call me at(303) <br /> 866-5127. <br /> 1 <br /> Sincerely, <br /> 41 F <br /> CHERYL A. LINDEN <br /> First Assistant Attorney General <br /> Natural Resources and Environment Section <br /> (303)866-5127 <br /> (303) 866-3558(FAX-) <br /> cc: Mike Long, Director,w/o attachments <br /> Steve Renner,w/o attachments <br /> 20'd LO ST 66, S 1-30 8SS2998£0s�:x2d <br />
The URL can be used to link to this page
Your browser does not support the video tag.