My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (210)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (210)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:34:33 AM
Creation date
6/19/2012 2:57:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) 2007 Correspondence
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 describes construction projects conducted in support of more specific reclamation <br /> work. These projects were conducted either to support actual reclamation of mine <br /> specific facilities, to maintain then-existing mining related facilities for the purpose of <br /> minimizing off-site environmental impacts, or to maintain reclaimed areas. The areas <br /> impacted by these projects are not included in the count of acreage reclaimed at Coal <br /> Basin, as final reclamation was accomplished during execution of one of the projects <br /> listed in the body of the report. <br /> Table 2. Projects Conducted in Support of Reclamation Construction at Coal <br /> Basin. <br /> Public or <br /> Year(s) Private Project Description <br /> Project Name Undertaken Property <br /> Site Storm water drainage <br /> Maintenance 1994 Both maintenance <br /> Dutch Creek <br /> Flume Repair 1995 Private Repair Dutch Creek Flume <br /> Pass spring runoff safely/ <br /> Spring 1995 Both Unreclaimed area <br /> Maintenance maintenance <br /> Spring Maintain both reclaimed <br /> Maintenance 1996 Both and unreclaimed areas <br /> Tree Planting Plant trees at reclaimed <br /> Project 1997 Public areas <br /> Spring Maintain both reclaimed <br /> Maintenance 1997 Both and unreclaimed areas <br /> Wash Plant Demolition of concrete <br /> Demolition 1998 Both buildings, foundations <br /> Noxious Weed Biologic and spray control <br /> Control 1998 Both of noxious weed infestation <br /> Spring Maintain both reclaimed <br /> Maintenance 1998 Both and unreclaimed areas <br /> Noxious Weed Spray control of noxious <br /> Control 1999 Both weed infestation <br /> Fall Maintain both reclaimed <br /> Maintenance 1999 Public and unreclaimed areas <br /> Rock Tunnel Maintenance at reclaimed <br /> Area 1999 Private and unreclaimed areas in <br /> Maintenance Rock Tunnel vicinity <br /> Ditch 8 Diversion ditch <br /> Reconstruction 2000 Public reconstruction <br /> Plant trees at reclaimed <br /> Tree Planting 2000 Both areas <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.