Laserfiche WebLink
Table 1 Notes <br /> (1) —Includes Mine 3 loadout and access; <br /> (2) —Includes Mine 4 fan and loadout; <br /> (3) - Sutey reclaimed in 1995, rill and gully maintenance performed in 1999; <br /> (4) - Includes Mine 1 fan, road, office complex and loadout; <br /> (5) - Roads B, D reclaimed in 2000, Roads E and F reclaimed in 1996; each re-disturbed <br /> to accommodate 2004 Outslope Project. Seed applied to re-disturbed portions fall, <br /> 2004; <br /> (6) - One acre of Road E at North Fork of Dutch Creek crossing reclaimed in 1999 as <br /> part of the Rock Tunnel Maintenance Project, <br /> (7) - Road F acreage includes Mine 3 Fan access road; <br /> (8) —Road G reclaimed in 1996, creek crossing maintenance performed in 2002; <br /> (9) —Office Vicinity is 10 acres, total. Eight acres reclaimed during the Dutch Creek <br /> Diversion project (Channel at 3 acres, adjacent area at 5 acres), 2 acres reclaimed at <br /> Facilities Area project; <br /> (10)—Upper portion of outslope completed with Mine 3 in 1995, lower portion <br /> completed with North Basin Steep Slope Revegetation in 1999. <br /> (11)—The Mine Bench Outslopes located at Mine 1, Mine 3 south and at the Mine 5 fan <br /> were seeded during the 1999 and 2004 construction seasons. 2004 is used here to <br /> describe the year reclamation was completed. Acreages reclaimed are tabulated <br /> only once, in the 2004 reclamation season. <br /> 25 <br />