Chapter V <br /> Two additional sediment ponds will be constructed, in addition to <br /> the three in place, to provide additional storage volume for <br /> handling the sediment load from mine discharges. TR-5 of October <br /> 16, 1986 approved construction of the ponds. See App. II-B-3 for <br /> supporting calculations. <br /> Reclamation of the large tunnel fill area on the south side of the <br /> Dutch Creek drainage will commence after final completion of the <br /> tunnel project, when there is no furthe rmaterial to be placed on <br /> the site. As ntoed, further work on the tunnel must still be done <br /> and involves driving lateral extensions to workings accessed now by <br /> #3 , #4 and #5 Entries, and continuation of the tunnel to a break- <br /> out point west of Huntsman Ridge. That work will generate <br /> additional underground development waste, which will be placed in <br /> this area. <br /> Reclamation of this tunnel fill area will involve topsoil placement <br /> and revegetation with the approved 8, 000' seed mixture. <br /> The topsoil piles (there are two, one below the sediment ponds, and <br /> one on the south side of Dutch Creek) have been seeded with the <br /> temporary seed mix. <br /> c. Haul Roads. <br /> When the current width of the haul roads is no longer necessary for <br /> operations, and when safety considerations allow, Mid-Continent <br /> will begin an interim program aimed at reclamation of the haul <br /> roads. <br /> The interim reclamation plan is as follows: <br /> - The inside ditch will be moved out approximately 10' from <br /> the hillside into the road. <br /> The culvert drainage system will remain functional. <br /> Where the new inside ditch passes over a culvert, the <br /> culvert will be uncovered with a backhoe and cut with a <br /> torch. <br /> 17 Revised 2/92 <br />