Laserfiche WebLink
C i ' = - a� _ FPUFFEPT 11ELR[1E TEL • '-' <br /> a schedule under which the seed and mulching would be carried out: <br /> between September 15 and October 15, 1992 , as required by your <br /> letter. This page has been revised to include this schedule. <br /> l n addition, the NOV (C-91-018) had specified use of straw bale <br /> dike or silt fencing along specified portions of the road. it <br /> occurs to me that berms might be a feasible alternative in some <br /> locations, and that depressions , or b.a.t. ponds could be useful as <br /> well . A paragraph has been added to indicate that these <br /> alternative methods for stabilization/siltation control may be <br /> employed as necessary and wherever feasible and practicable, <br /> in <br /> areas of where slope conditions are clearly unfavorable for <br /> establishment of vegetative cover. These include silt fencing, <br /> terming, straw bale check dams and b.a.t. ponds . <br /> The NOV had specified areas along the roads at which these efforts <br /> would be made, and T gave included that list, for reference, as an <br /> attachment to this submittal , although I did not think it necessary <br /> to include the list in the permit itself. As to timing, I have <br /> indicated that these measures will be taken as snowmelt allows <br /> access to the roads. However, I am uncertain, given other <br /> viiJ ntenance requirements for the roads and ditches, and the <br /> passibility of late snowmelt, that a deadline of August l allows <br /> sufficient time for this work to be completed. <br /> Yours truly, <br /> Diane Delaney <br /> Mid-Continent Resources --- <br />