Laserfiche WebLink
TABLE II-B-1 <br /> COAL BASIN TUNNEL PROJECT <br /> RECLAMATION SCHEDULE <br /> OF ROADS AND ASSOCIATED WORK AREAS <br /> SUMMER 1979 Face Up <br /> FALL 1979 Reclamation of face-up areas <br /> FALL 1980 Tunnel drilling starts <br /> FALL 1985 Tunnel completed to No . 1 Mine <br /> 1986 Tunnel completed to No . 2 Mine-- <br /> Complete tunnel to outside on westside of <br /> Huntsman' s Ridge* <br /> 1985 - 87 Construction of conveyors, drainage systems , <br /> power systems, bins, shops, offices and bathhouse <br /> facilities . <br /> Revegetation of mine portals and associated <br /> roads , No . 1 and No . 2 Mines ; the actual work at the <br /> portals will begin with the removal of nonessential <br /> buildings and equipment . The ventilation fans , power <br /> lines and associated equipment and shelter required to <br /> maintain this equipment will remain. The areas of the <br /> mine portals not in use will be reshaped, scarified , <br /> soil amendments added, and grass, shrubs , and trees <br /> planted in the fall . (i. e. , the fall has proven by <br /> experiment to be best time to plant . ) The roads will <br /> be reduced from Haul Roads to Light Use Road classifi- <br /> cation. (See November 26, 1979 Coal Basin Road Drainage <br /> report. The present width of 50 ' to 60 ' would be <br /> reduced to 20 ' to 30 ' . The outside ditch will be <br /> brought out into the road and the cut slope allowed to <br /> slough. Grading material from the road will be allowed <br /> to collect on the outside as a permanent berm in areas <br /> not designated for snow removal . These areas and the <br /> cut slopes will then receive intensified revegetation <br /> efforts -- i . e. , heavier mulch and seed mixtures . <br /> FALL 1988 Cuts and berms if stabilized will be planted <br /> with shrubs and trees . <br /> 1986 - 87 The tunnel will be extended laterally (on the <br /> strike) from No . 1 Mine to No . 3 and No . 5 <br /> Mines . <br /> 1987 - 88 As the coal and equipment transportation <br /> systems are completed, the portals and roads at No . 3 <br /> and No . 5 Mines will be partially revegetated . <br /> *Actual construction time will depend on mining conditions <br /> encountered . <br /> 43 <br />