My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (223)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (223)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:56:17 AM
Creation date
6/19/2012 1:04:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,%LII-COXTINE\'T RESOURCES.INC. <br /> 201 Centennial St.,Suite 406 <br /> Glenwood Springs. Colorado 81601 <br /> (303)945.4958 <br /> May 10, 1985 <br /> Ms. Candace Thompson <br /> Mined Land Reclamation Division <br /> 423 Centennial Building <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br /> RE: Technical Revision - Coal Basin Underground Mining Plan k <br /> Dear Candace: <br /> Transmitted herewith is a technical revision to the Coal Basin <br /> Mining Permit Application that is designed to update three <br /> aspects of the underground mining plan. These are the under- <br /> ground mining sequence, a modification of the rock tunnel plan <br /> to include its extension to a portal on the west slope of <br /> Huntsman Ridge, and a modification of the methane g s drainage <br /> plan that includes vertical drainage shafts to the =urface. <br /> This revision is required at this time to bring the mining plan <br /> into line with •changes that are considered necessary to meet <br /> future coal production goals and to improve mining efficiency <br /> and safety. <br /> Request your timely review and approval of this revision so that <br /> final Forest Service approval of surface road construction and t. <br /> tunnel portal exploration work can be accomplished during the <br /> 1985 summer construction period. " <br /> Sincerely, <br /> �ZcLr , <br /> George E. Wear <br /> Director, Special Projects <br /> GEW:rm <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.