Laserfiche WebLink
May 8, 2012 C- 1996 -083 /13owie No. 2 Mine BFB <br />pieces of sheet metal were blown off the worksite and need to be removed from the revegetated slope. <br />SIGNS AND MARKERS — Rule 4.02: <br />The main entrance sign was visible with all the required information. <br />DOCUMENTS RECEIVED: None <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />Infraction Number: CV2012004 <br />Inspection Date: April 11, 2012 <br />Date Issued: May 1, 2012 <br />Primary Topic: Hydrologic Balance <br />Secondary Topic: Processing Waste <br />Tertiary Topic: <br />Description: Failure to prevent drainage from flowing over outslope of waste disposal area. <br />Abatement 4: 1 <br />Abatement Due Date: 5/18/2012 <br />Abatement Description: Remove the coal mine waste from the edge of the outslope of Gob Pile <br />No. 4, remove the CMW that flowed down the outslope of Gob Pile No. 4, restore all lateral ditches on <br />the outslope of Gob Pile No. 4 and restore collection ditch D -D3 to the design standards. <br />Photo 1 — Work Being Done on Gob Pile 4 to Abate NOV <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 4 of 7 <br />