My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-18_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2012-06-18_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:00:43 PM
Creation date
6/19/2012 12:46:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
6/18/2012
Doc Name
Adequacy Review Letter & Cost Estimate
From
DRMS
To
Roy Karo
Type & Sequence
SL1
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Regrade Rail Loop <br />Site: Hayden Gulch Loadout Permit Action: SL Permit/Job #: C1992081 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: <br />Date: 6/15/2012 County: <br />User: JLE <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D10T - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C081 -001 <br />Total unit Cost/Hour: $340.43 <br />Total Fleet Cost/Hour: $680.86 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$111.83 <br />NA <br />Operating Cost/Hour: <br />$181.78 <br />100 <br />Ripper op. Cost/Hour: <br />$8.34 <br />100 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $340.43 <br />Total Fleet Cost/Hour: $680.86 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />64,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />72,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />946.0 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-10% <br />6,400 feet <br />2,650 lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.