Laserfiche WebLink
Task description: Regrad <br />Site: Hayden Gulch Loadout <br />BULLDOZER WORK <br />Truck Loop Pond <br />Permit Action: SL1 <br />PROJECT IDENTIFICATION <br />Task #: 018 State: Colorado <br />Date: 6/15/2012 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />iPMENT COST <br />Cat D10T - IOSU <br />574 <br />Semi- Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$111.83 NA <br />$181.78 100 <br />$0.00 0 <br />538.49 NA <br />$332.09 <br />$332.09 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />1,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />1.125 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1.718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,400 feet <br />lbs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Page 1 of 2 <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -018 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 0.900 <br />(CAT HB)) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />