Laserfiche WebLink
Task description: Finish Grade Disturbed Area <br />Site: Hayden Gulch Loadout <br />Permit Action: SLl <br />PROJECT IDENTIFICATION <br />Task #: 015 State: Colorado <br />Date: 6/15/2012 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Permit/Job #: C1992081 <br />Abbreviation: None <br />Filename: C081 -015 <br />Basic Machine: CAT 14M <br />1.50 <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />Finish grading (0 -2.5 mph) - 1.5 <br />Shift Basis: 1 per day <br />30 <br />degrees <br />Data Source: (CRG) <br />Cost Breakdown: <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Utilization % <br />Ownership Cost/Hour: <br />$42.77 <br />NA <br />Operating Cost/Hour: <br />$67.12 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$24.47 <br />NA <br />Total Unit Cost/Hour: <br />$134.36 <br />Total Fleet Cost/Hour: $137.61 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 93.60 <br />acres <br />Source of estimated acreage: Total Disturbed Area Minus SL1 Acreage (11.9 acres) <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site <br />Altitude: 6400 feet <br />Source <br />Altitude Adj: 1.00 <br />(CAT HB) <br />Job Efficiency: 0.90 <br />(1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.6527 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.6527 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $81.30 per acre <br />Total job time: 56.63 Hours <br />Total job cost: $7,609.00 <br />CIRCES Cost Estimating Software <br />