Laserfiche WebLink
�- 1 1 'C1 - - C 1':4 7 Z '.C1 7 1.1 5 -y Q [ c <br /> Re. Stipulation No. 2: We would like to do the vegetation monitoring on the <br /> Sutey pile during the same years as we monitor the test plots at #4. <br /> Accordingly, we'll start the vegetation monitoring on Sutey during 1989 and <br /> continue every other year from that time. <br /> Under XIV. Operations Description. <br /> Interconnection of the mines will be through lateral extensions of the rock <br /> tunnel, rather than through normal coal development procedures. <br /> Page 8. <br /> Under XIX. Roads. <br /> We would also reestablish haulage on the #4 and #5 mine roads if sufficient <br /> demand develops for the coal prior to extension of the rock tunne` to intercept <br /> those workings, <br /> Yours truly, <br /> r <br /> Diane Delaney <br /> Mid-Continent Res. <br /> 2 <br /> 19 F,- 1 1-=;0 113 FA�E = C <br />