Laserfiche WebLink
TO: Mid-Continent Resources , Inc. <br /> DATE: January 14 , 1983 <br /> PAGE: - 4 - <br /> facilities for Colorado Westmoreland, and we are currently in- <br /> volved in the performance monitoring of significant fills and <br /> cuts at their property. <br /> For many years , we have been exposed to negotiations with the <br /> `- personnel of the Colorado Mined Land Reclamation Division and <br /> the :fined Land Reclamation Board. <br /> For these reasons , we feel that our qualifications for the pro- <br /> posed work are more than appropriate. <br /> SCHEDULE <br /> The following Table 1 shows the proposed scheduling of the job ; <br /> it has been based on the Mid-Continent requirements specified <br /> in the RFP. <br /> TABLE 1 JOB SCHEDULE <br /> PHASE TIMING <br /> 1. MINE BENCHES AND HAUL ROAD 14APPING <br /> 1-A Field work - June - September, 1983 <br /> 1-B Report submittal November 30 , 1983 <br /> 2. TEST AREAS - DESIGN AND CONSTRUCTION <br /> 2-A Engineering and design January - March, 1983 <br /> 2-B Construction July - October , 1984 <br /> 2-C Report submittal November 30 , 1984 <br /> 3. M014ITORING OF TEST AREAS PERFORIIANCE <br /> 3-A Annual reviews June - October , 1985 , 1986 , <br /> 3-B Final report submittal December 31 , 1987 1987 <br /> COST ESTIMATE <br /> GEO-HYDRO fees for the proposed work have been estimated using bil- <br /> ling rates and other charges presented in the attached GEO-HYDRO <br /> contract conditions . Identical rates would be used throughout the <br /> duration of the job . <br />