Laserfiche WebLink
MID-CONTINENT RESOURCES, INC. RECEIVE® <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> d <br /> TELEPHONEMINFD IpND REC._AMATICh0-.lfyTINENTRESOURCES INC 3 mxC010. Dept. Cif Natural eC ��-� 9/0 929 ee�cA'.FIELD ROAD-SUITE 220 <br /> :Ow9ROOK ILLINOIS60521 <br /> TLX <br /> 4S-0T24 <br /> Mr. Jim Herron <br /> Mined Land Reclamation Division <br /> 423 Centennial Bldg. <br /> 1313 Sherman St. <br /> Denver, Colorado 80203 <br /> Re: T.R. for Conveyor System - Tunnel to Wash Plant <br /> File No. C-017-81 (Bond) <br /> Dear Jim: <br /> Enclosed are the detailed figures for the reclamation of the conveyor/bin system. <br /> I. DISTURBED AREAS <br /> Area 1. Main bins/pad and cuts and fills 2.93 Acres <br /> 2. Beltway from No. 1 transfer to bins 0.69 <br /> 3. Stacker belt to No. 2 stockpile 0.23 <br /> 4. Straight belt on Sheet 3 of 7 1.03 <br /> S. Straight belt to tunnel 2.52 <br /> 6. Alternate coal storage area 2.30 <br /> 7. Topsoil storage area (above No. 1 transfer) 0.46 <br /> 8. Tunnel face-up 0.59 <br /> 9. Sediment ponds 0.40 + 0.22 + 0.14 0.76 <br /> Total 11.51 Acres <br /> II. --RECLAMATION COSTS <br /> Area 1. Removal of bin roofs (all steel structures) <br /> A. Welding truck @ $55.00/hr x 40 hrs $ :2,200 <br /> B. Boom truck @ $60.00/hr x 40 hrs 2,400 <br /> C. 3 Dump trucks @ $45.00/hr = $135.00 x 40 hrs 5,400 <br /> Area 1. (cont'd.) Return to A.O.C. <br /> A. Dragline @ $85.00/hr x 120 hrs 11,900 <br /> B. D-8 @ $75.00/hr x 90 hrs 6,750 <br /> C. Topsoil: D-8 + 2 trucks $165/hr x 8 hrs 1,320 <br /> D. Seed and mulch @ $300/ac. _.879 <br /> Subtotal $ 29,970 <br />