My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (216)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (216)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:45:06 AM
Creation date
6/19/2012 10:35:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mr. James Herron, MLRD Page 2 <br /> 5. Mid-Continent Resources Engineering Department is <br /> presently designing this alternate storage area and will sub- <br /> mit plans shortly. <br /> 6. Air quality permits enclosed. <br /> 7. The slurry pond will be used only very temporarily-- <br /> actually only as long as it takes to construct the new pond <br /> adjacent to it (see Geo-Hydro report April 184, 4/26/84) . The <br /> slurry pond would remain a slurry pond. The new pond requires <br /> 0. 59 ac. ft . of storage and the slurry pond has 1. 9 ac. ft . of <br /> storage. For a period of 30 days we would ensure that there <br /> is 0. 6 ac. ft . of storage in the slurry pond; this level would <br /> be marked on the side of the pond. <br /> The new pond has a NPDES discharge permit No . 396-020, <br /> and will discharge into Coal Creek. <br /> 8. Sheet 3 of 7 has been revised to ensure that all dis- <br /> turbed drainage on the north side of the hill will go into the <br /> new sediment pond 396-020. <br /> 9. This topsoil has been combined into the topsoil stock- <br /> pile adjacent to the No. 1 transfer point . <br /> 10. The conveyor belt through this area will have a full <br /> pan underneath that will be an extension of the bottom of the <br /> tube crossing Coal Creek. <br /> 11 . We will salvage 18 inches of topsoil along the belt <br /> line (see Question No . 2, 18, 333 cu. yds. ) and 24 inches across <br /> the face-up area (2 , 222 cu. yds. ) . <br /> 12. Geo-Hydro is presently working on revising the <br /> Sheet 3 of 7 and the computations pertaining to the topsoil <br /> pile area. <br /> 13. Geo-Hydro is presently working on the culvert <br /> locations, sizes and supporting calculations. <br /> 14 . Geo-Hydro is making the appropriate corrections . <br /> 15. Geo-Hydro is revising Sheet 3 of 7 to show the <br /> appropriate drainage for this area. <br /> 16 . The new Geo-Hydro calculations for pond -020 show <br /> this area controlled. <br /> All the Geo-Hydro revisions should be in your office by 5/14/84 . <br /> Contact me if you have questions or need more information . <br /> Sincerely yours, <br /> DWBowman:ms Environmental Coordinator <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.