My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (216)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (216)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:45:06 AM
Creation date
6/19/2012 10:35:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-CONTINENT RESOURCES;1NC. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> MID-CONTINENT RESOURCES,INC TELEPHONE <br /> 245 PLAINFIELD ROAD-SUITE 220 (303)963-2581 <br /> WILLOWBROOK,ILLINOIS 60521 TWX <br /> February 14, 1984 9109296897 <br /> TLX <br /> 45-0724 <br /> Mr. Jim Herron <br /> Mined Land Reclamation Division <br /> 423 Centennial Bldg. <br /> 1313 Sherman St. <br /> Denver, Colorado 80203 <br /> Re: Technical Revision, Proposed Refuse Disposal Site <br /> Coal Basin Mines Permit C-017-81 <br /> Dear Jim: <br /> We are in the final stages of obtaining the necessary property <br /> adjoining our wash plant. I would like to expedite this T.R. at this <br /> time. If our sunshine continues, there will be little or no snow on <br /> any of the south-facing slopes. Enclosed are the completed drawings and <br /> computations from Geo-Hydro. Please review the "construction sequence" <br /> on Sheet 3 of 9. If possible I would like to obtain a minor revision <br /> to start Phase I (May 84) . <br /> We would want to do some grading (road improvement) on the <br /> existing road, for better access in April; then go in and survey the <br /> center line and begin Phase I. <br /> The hydrologic baseline (1 year) will be done about March 15 <br /> and the vegetation baseline study is scheduled in June/July. <br /> Please contact me if you need additional information at this <br /> time. <br /> Sincerely, <br /> �2� Lf/ rN�L��JLi <br /> Environmental Coordinator <br /> DWBowman:ms <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.