My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (235)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (235)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 10:19:06 AM
Creation date
6/19/2012 10:34:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Plan - Gas Well Light Use Road <br /> November 29, 1984 <br /> Page two <br /> end loader would work simultaneously to distribute and spread the <br /> topsoil and pull up, smooth and round off the cut and fill edges . <br /> The equipment would start at the drill pad and work their way out <br /> or downhill to the existing road. The seed and mulching would be <br /> done as the topsoiling and grading were completed. <br /> SEED MIXTURE: <br /> Grasses Seeding Rate <br /> Redtop 1/2 <br /> Kentucky Bluegrass (Troy) 1-1/2 <br /> Canada Bluegrass (Rubbins) 1-1/2 <br /> Timothy 1-1/2 <br /> Creeping Meadow Foxtail 4 <br /> Smooth Brome (Manchar) 6 <br /> Hard Fescue (Durar) 4 <br /> Red Fescue 4 <br /> Forbs: <br /> Cicer Milkvetch 1 <br /> Dutch Clover 1 <br /> Alsike Clover 1 <br /> Lewis Flax 1 <br /> TOTAL 27 lbs/acre <br /> MULCH: 3000 lbs/acre of straw will be used. The seed and straw <br /> will be broadcast by hand. <br /> A liquid tackifier or plastic netting will be used if necessary to <br /> hold the mulch in place before the first snow. <br /> SCHEDULE: <br /> Spring 1985 Road and drill pad construction <br /> Summer 1985 Drilling <br /> Fall 1985 Vegetation of cut and fill <br /> sections of drill road and pad <br /> Summer 1986 Reclaim and complete revegetation <br /> of drill road and _pad if abandon- <br /> ment is imminent. <br /> COSTS: Reclamation would require approximately two days time <br /> with the equipment; 8 to 10 hours work and 4 to 6 hours to mobilize <br /> and demobilize. <br />
The URL can be used to link to this page
Your browser does not support the video tag.