Laserfiche WebLink
June 6, 2012 C- 1981 - 041 /Roadside Portals MPB <br />delineates the boundary between Fish & Wildlife and Industrial /Commercial Post Mining Land Use. The <br />redisturbed area associated with the pipeline should be restored to this same condition shown in Photo No. 1. <br />Photo No. 2 taken during this inspection shows the current condition of the site. <br />The RSRDA waste disposal site at the South Portal is well maintained and stable. A small amount of flowing <br />water is present in the lower terrace ditch which ultimately flows down to Pond 9. This water originates from the <br />South Portals French Drains which discharge a small flow to the North Collection Ditch then to the lower RSRDA <br />terrace ditch (Photo No. 3). <br />DOCUMENTS RECEIVED <br />None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 3 of 6 <br />