Laserfiche WebLink
Mr. Jim Herron October 31, 1983 Page 2 <br /> 5. The bench for the transfer point will be started <br /> with a D-8 cat after the vegetation (sparse cover- <br /> Mancos hillside) is removed. Any topsoil encountered <br /> will be saved; there is none visible. The cut mate- <br /> rial will be placed in the small drain just north of <br /> cut (see map) . A culvert will be placed in this <br /> draw first . This material will be used to return to <br /> A.O.C. (see reclaim drawing) after mining has <br /> stopped. <br /> 6. Sediment control will entail sloping all pads and <br /> roads to the inside and berming the outside. The <br /> transfer pad will have a drop structure (see drawing) <br /> which will tie into the existing drain that goes <br /> across the front gate. The small additional drainage <br /> (0. 11 acres) will not affect the main sediment pond <br /> system, as it is oversized. <br /> Please contact me immediately if you have any questions con- <br /> cerning this matter. <br /> Sincerely, <br /> Environmental Coordinator <br /> DWBowman:ms <br /> Enclosures : Maps, Specifications <br />