My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (206)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (206)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:29:16 AM
Creation date
6/14/2012 10:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Measurement and Payment <br /> Areas where trees and trees and shrubs will be sampled to determine whether the <br /> specified planting densities have been met. Areas where the specified planting <br /> densities have been met will be measured to the nearest 0.1 acre and paid at the unit <br /> price bid on the Bid Schedule Item 6. The price bid shall include all costs for labor, <br /> materials, equipment and all other items necessary for tree and shrub planting as <br /> described in these specifications. Task 6, Tree and Shrub planting is NOT <br /> guaranteed. <br /> PROJECT OBSERVATION <br /> The PROJECT MANAGER will be at the project site periodically to monitor <br /> construction activities and ensure that each work item is completed and constructed <br /> to design specifications. The PROJECT MANAGER will be available during regular <br /> business hours (8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be <br /> scheduled on weekend days or holidays without prior approval of the PROJECT <br /> MANAGER. It is the CONTRACTOR'S responsibility to schedule inspections with the <br /> Project Manager so as not to delay the work The following items miist be observed <br /> and approved by the PROJECT MANAGER before proceeding with additional work: <br /> 1. Upon completion of native seed collection and cleaning operations; <br /> 2. Upon completion of the first half (1/2) acre of outslope preparation work; <br /> 3. Upon both initiation and completion of outslope seeding <br /> operations; <br /> 4. Upon both initiation and completion of bonded fiber m:_tm <br /> application. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.