Laserfiche WebLink
of the benches and depression,s as directed and described in the sp%cifications. <br /> Payment will be as this task is completed and approved by the PROi CT MANAGER. <br /> Payment for this task will be made only for the unit price shown under Item 3 of the Bid <br /> Schedule. <br /> TASK 4 OUTSLOPE REVtGETATION <br /> The purpose of this task is to distribute the native seed collected during performance <br /> of Task 2, Native Seed Collection, along wit.i the complimentary se(. ,d listed in Table <br /> 1, Outslope Seed Mixture on the mine and road bench outslopes. <br /> All areas disturbed during reclamation work and any other areas specified in these <br /> Special Conditions will be revegetated according to the Revegetation Specifications <br /> in the General Bid Specifications Section 20.0, except as modified by these Special <br /> Conditions. All areas will be broadcast seeded with the native species collected in <br /> Task 2, Native Seed Collection, and with the complimentary commercial species, <br /> Table 1. <br /> Due to site conditions, no revegetation efforts may be initiated prior to September 15, <br /> 1997. <br /> In addition to the revegetation specifications outlined in Section 20.0 attached, the <br /> following requirements will be adhered to: <br /> SLOPES PREPARED AS PER TASK 3 <br /> Seed <br /> The seed listed in Table 1, Outs'lope Seed Mixture, will be provided l)y the OWNER. <br /> CONTRACTOR must give the PROJECT MANAGER at least ten (10)working days <br /> notice of the acreage to be see eiedd. so that the proper amount of seed is delivered. In <br /> addition, five pounds (5#) per acre of Calamagrostis (Sp?) and Senecio (Sp?) seed, <br /> which was collected in Task 2, Native Seed Collection, shall be broadcast on the <br /> outslopes. <br /> Fertilizers <br /> Fertilizer shall be provided by( ONTRACTOR, and shall conform to Section 20.2 <br /> (commercial fertilizer) of the Revegetation Specifications, attached. Fertilizer shall be <br /> applied as per the attached specifications during performance of Tcrsk 3, Outslope <br /> Preparation. <br /> Seedbed Preparation <br /> Seedbed preparation was accomplished on these slopes during performance of Task <br /> 3, Outslope Preparation. <br />