Laserfiche WebLink
r <br /> PROJECT WORK DESCRIPTION <br /> Project Overview <br /> The goal of this project is to accomplish revegetation of steep mine bench and road <br /> outslopes in the vicinity of Mine 4 (Map 4, Steep Slope Revegetation Map) at the Coal <br /> Basin Mine. <br /> The project goals will be accomplished by completing a number of steps in the <br /> revegetation process. Seed from a native grass and a native forb species will be <br /> collected from other areas with similar characteristics at the mine site. Selected <br /> steep slopes will be mechanically prepared for revegetation, fertilized and seeded. <br /> At other selected steep slopes, a liquid erosion control blanket, known as a bonded <br /> fiber matrix (BFM), will be applied after fertilization and seeding of the slopes. Small <br /> trees and shrubs may be hand planted above and below the work areas. <br /> Note that volumes, distances and areas sta'-)d in this Invitation for B--d are estimations <br /> only. CONTRACTORS are responsible for verifying all estimations prior to bid <br /> submittal. <br /> Work Tasks <br /> The Tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Native Seed Collection <br /> Task 3: Outslope Preparation <br /> Task 4: Outslope Revegetation <br /> Task 5: Outslope Protection <br /> Task 6: Tree and Shrub I ianting <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with Specification 1.0, Mobilization/Demobilization, attached. <br /> 7 <br />