My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (206)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (206)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:29:16 AM
Creation date
6/14/2012 10:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS <br /> Coal Basin Mine 4 Revegetation Project <br /> Permit No. C-81-017 <br /> PKA-8-400 <br /> PROJECT LOCATION <br /> The project is located four miles west of Redstone in Pitkin County, Colorado. The <br /> mine is accessed via a paved service road. Roads on the mine property are improved <br /> dirt (Map 1, General Location Map). <br /> WORK SUMMARY <br /> The project will be conducted on a mine site previously permitted by the State of <br /> Colorado, Division of Minerals and Geology(Map 3, Coal Basin Mine Map). The site <br /> was active as an underground i mining operation from 1953 until 1991. The Colorado <br /> Mined Land Reclamation Board revoked the mining permit and forfeited the <br /> reclamation bond. The disturbances created as a result of activities at the site since <br /> August 3, 1977 are the subject of the reclamation activities addressed in this and <br /> subsequent Invitation to Bid documents. <br /> The project work will include rOvegetating steep slope areas at and near Mine 4. This <br /> will be accomplished by collecting native seed from nearby areas, p;eparing the <br /> ground surface at selected sloes of the project area, seeding and riaulching of the <br /> steep slopes identified for reve'getation, and hydraulic application of a bonded fiber <br /> matrix on selected slopes of the project area. Trees and shrubs mad be planted in the <br /> vicinity of the project area. <br /> PRE-BID MEETING AND SITE,SHOWING <br /> A mandatory pre-bid meeting and site showing will begin at the Coke Ovens at the <br /> south turnoff to Redstone on State Highway 133 (Map 2, Pre-Bid Mec:.ing Location). <br /> This mandatory meeting will begin on July 9. 1997 at 10:30 a.m. <br /> The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site <br /> and vicinity. Bidders are advised to be prompt. A sign-in sheet will be available at <br /> the Pre-Bid meeting for firms to register their attendance. It is the bidder's <br /> responsibility to make certain their attendance is recorded on the sign-in sheet. <br /> Failure to sign-in or to attend the entire meeting will be cause for rejection of a bid. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.