Laserfiche WebLink
P <br /> O <br /> WESTERN STATES <br /> Reclamation, Inc. <br /> a • <br /> 11730 Wadsworth Blvd Broomfield, Colorado 80020 • (303) 469 1986 <br /> September 4, 1997 <br /> FAX NO: (970) 241-1516 <br /> Mr. Steve Renner <br /> STATE OF COLORADO <br /> Division of Minerals and Geology <br /> 2148 Broadway, Unit#C-5 <br /> Grand Junction, CO 81503 <br /> RE: Coal Basin Mine 4 Revegetation <br /> Project Schedule <br /> Dear Steve: <br /> I was sitting down this morning to review the schedule which was generated by another <br /> office member regarding the Coal Basin Mine and realized that there were numerous <br /> mistakes in the start and stop times as reflected on the schedule dated September 3, <br /> 1997. Please disregard this schedule, as it is inaccurate. As soon as I noticed conflicts <br /> with the schedule, you and I had talked via phone. I chuckled when you said a letter <br /> would be coming across my desk via fax which indicated severe conflicts with this <br /> schedule. It was not my intention to give you a massive coronary with incorrect <br /> information. <br /> Please review the revised schedule which I think meets both Minerals and Geology and <br /> Western States' needs on this project. Currently we show completing the project by <br /> September 30, 1997, pending any weather days. The schedule is based on working <br /> seven (7) days a week and Western States assumes responsibility for overtime and/or <br /> for rotating personnel to accomplish this task. <br /> This schedule reflects starting some of the seeding prior to collection of the three <br /> different species on site (calamagrostis, senecio, and aster). We feel that the schedule <br /> requires starting the hydroseeding process as soon as possible. Therefore, we ask that <br /> the initial hydroseeding not be delayed while we are in the process of hand collecting the <br /> three species. <br />