My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (206)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (206)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:29:16 AM
Creation date
6/14/2012 10:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 5TATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources P P r4 7, <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone.(303)866-3567 <br /> FAX:(303)832-8106 <br /> September 4 , 1997 DEPARTMENT OF <br /> NATU <br /> VIA FACSIMILE TRANSMISSION RE O ROS <br /> Mr. David Chenowith Roy Romer <br /> Governor <br /> Western States Reclamation <br /> James Lochhead <br /> 11730 Wadsworth Boulevard <br /> Executive Director <br /> Broomfield, Colorado Michael B Long <br /> 80020 Division Director <br /> RE: Coal Basin Mine 4 Revegetation Project (PKA-8-400) <br /> Dear Mr. Chenowith: <br /> I received your proposed schedule for completion of the Mine 4 <br /> Revegetation Project. I am concerned that the schedule as outlined <br /> will not allow for completion of the project. As we have <br /> previously discussed, good fall construction weather at Coal Basin <br /> is sporadic at best. This year the weather appears to be <br /> deteriorating more quickly than usual . I believe that the only way <br /> the project will be completed in 1997 is to compress the schedule <br /> and to simultaneously complete as many tasks as possible. <br /> My specific concerns are as follows: <br /> Seed Collection. The schedule calls for seed collection to begin <br /> September 14, 1997. iIt has been my understanding from our <br /> conversation of September 3 , 1997 and from a previous conversation <br /> with your consultant Dave Buckner, that seed collection should <br /> start during the week of September 8, 1997. As was stated at the <br /> pre-bid meeting, I can show the contractor likely collection areas, <br /> however it is the contractors responsibility to assure that seed is <br /> collected when it is ripe. There should be some provision made to <br /> assure that seed is monitored and collected when it is ready. If <br /> for some reason the seed is not collected, the project as a whole <br /> is not a viable one. <br /> Imprinting. Due to weather delays which are typical in September, <br /> imprinting should begin immediately upon arrival of the dozer and <br /> any ancillary equipmenty but by no later than September 12, 1997. <br /> Should imprinting begin any later, it is my opinion that the job <br /> will not be completed in 1997, due to the potential for early fall <br /> snows rendering the site inaccessible. If it appears likely that <br /> seeding and mulching will not occur due to weather conditions, <br /> imprinting will need to 'be suspended as well. <br /> Soil Preparation. Soil preparation will be accomplished by virtue <br /> of using the imprinter. Soil preparation is not required on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.