Laserfiche WebLink
r <br /> October 15, 1987 MR-6, Temporary Seed Mix <br /> October 26, 1987 M R-7M Sutey Conveyor Area Expansion <br /> March 15, 1988 MR-8, Pond Cleanings on Rock Tunnel Pile <br /> March 23, 1088 MR-9� Strip & Stockpile Topsoil - Sutey Site <br /> June 1, 1988 MR-10. Ditch Design at Sutey Conveyor Site <br /> June 30, 1988 MR-11. Winter Storage - Non-Coal Waste <br /> August 12, 1988 MR-12. Install Ventillation Fan - No. Mine <br /> October 20, 1988 M R-13. Extend Sutey Topsoil Pile <br /> January 13, 1989 MR-14. Clear Powerline Right-of-Way <br /> April 6, 1989 MR-15. Pipeline Diversion-Rock Tunnel Ponds <br /> May 16, 1989 MR-16L Sutey Topsoil Pile Culvert <br /> June 28, 1989 MR-17'. Sediment Control - Sutey Topsoil Pile <br /> July 1, 1989 MR-18. Pond Cleanings on Tunnel Waste Pile <br /> June 30, 1989 MR-19. Aluminum Sulfate - Tunnnel Ponds <br /> July 7, 1989 MR-20. Use of NALCO 7883 in Sediment Ponds <br /> July 14, 1989 MR-21. Use of Guargum in Sediment Ponds <br /> August 9, 1989 MR-22. Overland Conveyor Site Drainage <br /> August 25, 1989 M R-23u Dutch Creek Channel Repair <br /> August 31, 1989 MR-24:, Pipeline for Water Treatment Facility <br /> October 26, 1989 MR-25' Brieden Plant Expansion <br /> 4 <br />