My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-04-01_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-04-01_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2021 7:46:54 PM
Creation date
6/14/2012 10:08:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
4/1/1993
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6, 1984 FirstilPhase - Sutey Conveyor System <br /> Summer, 1984 Arctic Circle Sediment Pond. <br /> September 10, 1984 Revegetation Seed Mix - Conveyor Cooridor <br /> September 11, 1984 Upgrade Light Use Road <br /> September 11, 1984 Modification of Ground Water Monitoring <br /> September 18, 1984 Relocation of Powerline at Preparation Plant <br /> October 3, 1984 Coal Storage on No. 2 Mine Bin Pad <br /> November 14, 1984 Trommel Waste at No. 1 Mine Strip Pit <br /> December 3, 1984 Coagulant - Sediment Ponds <br /> December 7, 1984 New Seed Mix for Sutey Area <br /> March 19, 1985 Powerline Relocation <br /> July 11, 1985 Rock Tunnel Sealing Plan. Stip. No. 4 <br /> July 11, 1985 Muck,pond <br /> July 11, 1985 Sediment Pond Cleaning on Sutey Waste Pile <br /> July 11, 1985 Enlarged Culvert - No. 5 Mine Road <br /> July 24, 1985 Rill and Gully Repair Program <br /> October 16, 1985 Powerline to New Fan Location <br /> November 14, 1985 Tree Removal for Power Poles <br /> February 20, 1986 MR-1. Berm Width at Sutey Topsoil Pile <br /> June 6, 1986 MR-2. Inspection Frequency Old Refuse Pile <br /> July 2, 1986 MR-3. !Relocation of Powerline <br /> December 7, 1986 MR-4. Satisfaction of Stip. No. 1 to MR-1 <br /> July 27, 1987 M R-5. dock Tunnel Pond "A" Spillway <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.