My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (208)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (208)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:30:51 AM
Creation date
6/14/2012 10:00:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MID-CONTINENT RESOURCES, INC. <br /> PRODUCER$OF THE FAMOUS COAL BASIN COKING COAT <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> M il !(r,;IINf N�HC`J(IF.E` INC TELEPHONE <br /> E AI NI IE I I'i+.IAf SJIIC ;',i (3UJi 9("12bt1 <br /> VI:I lV.HL;(nh IIIIN pS FO' TW> <br /> 910 91P 6F 42. <br /> November 6 , 1984 Tln <br /> 4S 077a <br /> Mr . Jim Herron <br /> Mined Land Reclamation Division <br /> 423 Centennial Bldg. <br /> 1313 Sherman St . <br /> Denver , Colorado 80203 <br /> Re : Stipulation No . 7, Backfilling and Grading Plan <br /> for the Preparation Plant Area <br /> Dear Jim: <br /> Enclosed is the revised Preparation Plant B&G plan. We will <br /> also change Vol . 7 , Chapter V, Page 31 to read as follows : <br /> 11b . Preparation Plant Area <br /> All coal mining and processing structures, equipment <br /> and associated support buildings , ponds , ditches and <br /> power lines will be removed . <br /> The entire area will be regraded and/or filled to A.O.C. <br /> Most of the area was disturbed before current State and <br /> Federal environmental laws were in effect , and topsoil <br /> and/or B or C horizon materials were not salvaged . For <br /> this reason if fill material is needed, concrete rubble , <br /> coal refuse and/or trommel rock will be used for the <br /> initial fill . It is estimated 103 , 700 . cubic yards of <br /> fill material would be required to return to A.O.C. <br /> Surplus topsoil from the Sutey refuse pile area and/or <br /> the glory hole and conveyor area will be placed over the <br /> initial fill material . It is estimated that 6 to 12 <br /> inches would be available , approximately (6000 cu . yds. ) . " <br /> Please contact me if you have any questions . <br /> Sincerely , <br /> Environmental Coordinator <br /> DWBowman :ms <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.