Laserfiche WebLink
Mr. Jim Herron Page 2 <br /> * Based on the availability of topsoil, the entire wash plant area was <br /> constructed pre-law and no topsoil was salvaged. An attempt will be <br /> made to salvage extra topsoil from the Glory Hole/Sutey projects. <br /> Please contact me if you have any questions. <br /> Sincerely, <br /> J-17 <br /> Environmental Coordinator <br /> DUBowman:ms <br /> Enclosures <br />