My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-18_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1997-06-18_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 11:55:39 AM
Creation date
6/14/2012 9:59:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
6/18/1997
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will NOT be rippe The areas graded on either side of Road <br /> A will be ripped er specifications . <br /> 8 . WAREHOUSE VICINITY Road A will not be graded or reduced <br /> between the low w�ter crossing described in Task 8, Surface <br /> Drainage: Channel Construction, east to the western edge of <br /> the Warehouse Vicinity backwall reduction operation. <br /> 9 . TOPSOIL STOCKPILE The topsoil to be removed will be hauled to <br /> an area located immediately north and east of the eastern <br /> margin of the Warehouse Vicinity, and immediately north of the <br /> Road A switchback (see Map 4, revised and attached) . This <br /> site is located closer to the project area than the originally <br /> designated area. <br /> TASKS 8 and 10 SURFACE DRAINAGE: CHANNEL CONSTRUCTION; REVEGETATION <br /> 1 . All channels to be constructed during performance of this <br /> Project shall be seeded with the Diversion Mixture immediately <br /> upon completion of each channel, and before installation of <br /> rip rap, where required. Seeding shall be accomplished as per <br /> General Bid Specification Section 20. 0 . PROJECT MANAGER shall <br /> provide seed. Other than the channels, no revegetation shall <br /> occur prior to September 2, 1997 . <br /> 2 . Mulching is required for this project . Mulch shall be <br /> provided by CONTRACTOR, and shall conform to Section 20 .2 of <br /> the Revegetation Specifications, except that all mulch shall <br /> be certified as noxious weed free or noxious weed seed free by <br /> any authorized State or County Officer. <br /> 3 . All terms and conditions of the Invitation and Bid other than <br /> as changed by this amendment remain the same. <br /> 4 . Receipt and acceptance of this amendment shall be acknowledged <br /> on the Bid Form. <br /> C: \wp51\midc\bids\wrseam. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.