My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-06-18_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1997-06-18_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2021 11:55:39 AM
Creation date
6/14/2012 9:59:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
6/18/1997
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> DEPARTMENT OF <br /> Date: June 18, 1997 NATURAL <br /> RESOURCES <br /> TO: All Bidders on the Coal Basin/Warehouse Area Roy Reclamation Project Governor er <br /> James S.Lochhead <br /> FROM: Steve Renner, Division of Minerals and Geology Executive Director <br /> Michael B Long <br /> RE: Amendment #1, Coal Basin Warehouse Area Reclamatifts,on Director <br /> PKA-7-397 <br /> Thank you for attending the pre-bid meeting for the above <br /> referenced project . The following changes and clarifications <br /> should be noted and incorporated into the bid documents : <br /> GENERAL <br /> 1 . Time of Completion The date of completion will be October 16, <br /> 1997 . The time of completion is eighty(80) days. This <br /> includes ten (10) days mobilization time. <br /> 2 . Power Poles Since the Pre-Bid Meeting, I have been advised <br /> that the power poles located along the south margin of the <br /> Conveyor Corridor May be used after reclamation is completed. <br /> Therefore, and contrary to what was indicated at the Pre-Bid <br /> meeting, these poles may remain in place during the <br /> reclamation process. <br /> TASK 2 DEMOLITION <br /> 1. All trash or debris encountered during the project will be <br /> collected and either buried with the concrete rubble <br /> materials, or hauled to the facilities area for disposal by <br /> others . <br /> 2 . Conveyor Corridor There are approximately 114 pairs of <br /> cylindrical concrete foundations exposed along the corridor. <br /> 3 . Conveyor Corridor CONTRACTOR may dispose of concrete rubble <br /> generated during demolition activities at the Conveyor <br /> Corridor by digging a trench along the inside margin of the <br /> corridor, and burying the rubble. A minimum of four feet (41 ) <br /> of cover must be placed over any rubble disposed in this <br /> manner. <br /> 4 . Stockpile M Rubble generated from this work area may be <br /> disposed of within the upper and lower tunnels located within <br />
The URL can be used to link to this page
Your browser does not support the video tag.