Laserfiche WebLink
a, v NMI <br /> i' <br /> s <br /> F <br /> structure. <br /> Rubble generated through the demolition <br /> Of at the Central Work osal Process shall be disposed <br /> immediately south of the demolition c corridor te, which islocated <br /> disposal area shall be marked in the field by PROJECT MANAGER, the <br /> The perimeter of. <br /> The rubble <br /> generated as a result of <br /> including all other rubble, the demolition <br /> against the back wall of the disposal d debris Process, <br /> spread at the base of the feature for the le � shall be placed <br /> P area, and shall be evenly <br /> area. The rubble shall be placed as tightly <br /> disposal area. length of the disposal <br /> disposal The height of the rubble upon y as possible within the <br /> process, shall not exceed twenty feet completion of the <br /> from ground surface at the southern most extent of t <br /> area. The disposal area shall be constructed ) as measured <br /> completion, the side slopes of the rubble do not he disposal <br /> so that upon <br /> the north slope, 4H:1V on the east slope <br /> slope. Rubble shall be deposited in the disposal exceed 5H:1V on <br /> manner so that void spaces are minimized and 3H:1V on the west <br /> the rubble is level. area in such a <br /> height of eighteen inches Piece of rubble or debris may the top of <br /> surrounding material. above the mean elevation exceed <br /> the <br /> Materials targeted for demolition which lie within the footprint <br /> the disposal area do not need to be <br /> material, structure foundation or demolished unless ay h <br /> rubble which surrounds it upon completion exceeds <br /> dTak 2,height oof such <br /> East Work AreaDemolition. <br /> All concrete, block wall <br /> miscellaneous debris and materials located within the <br /> demolition area will be demolish asphaltic materials as well as <br /> Work Area disposal site. At least <br /> and transported to the well <br /> east three significant buildings had <br /> been located within this work area. <br /> A footer which is not <br /> associated with a mapped building has been observed at the eastern <br /> Portion of the work area, <br /> Portions of the work area. Asphalt has been observed in many <br /> footers shall be excavated tola tructures, foundations <br /> below <br /> ground level as measured from depth of three feet Pads and <br /> to each structure, ground surface immediately <br /> toRubble generated as a result of the <br /> demolition in the <br /> Area shall be transported to the Central Work Area for East Work <br /> Disposal of the rubble from this work area shall <br /> disposal area construction requirements described in the Central <br /> disposal. <br /> Work Area description, above, conform to the <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for <br /> this task <br /> 4 <br />