Laserfiche WebLink
PROJECT WORK DESCRIPTION + <br /> PROJECT OVERVIEW <br /> The goal of this project is to enhance the stability of the north facing slope of the Old Refuse Pile <br /> by creating a less steep slope through cut and fill operations. Generally, slopes will be <br /> excavated to achieve the desired slope angle. Much of the refuse excavated from the Old <br /> Refuse Pile will be transported to a designated disposal area located at the base of the north <br /> facing slope behind the former location of the Wash Plant. Some of the material will be used as <br /> fill material at the Old Refuse Pile to help achieve the desired configuration. Upon completion of <br /> cut, fill and disposal activities, the north slope of the Old Refuse Pile will be top soiled and <br /> revegetated. Trees will be planted on the affected area. Silt fence may be erected at the base <br /> of the pile to minimize sediment transport from the site. Map 3, Project Area, depicts the Old <br /> Refuse Pile, the disposal facility, topsoil stockpile location and other features. <br /> NOTE that maps, cross sections and figures will be distributed at the Pre-Bid Meeting. <br /> NOTE that volumes distances and areas stated in this document are ESTIMATIONS ONLY. <br /> CONTRACTORS are responsible for verifying all estimations prior to bid submittal. <br /> WORK TASKS <br /> The tasks included in this project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Earth Work <br /> Task 3: Topsoil Placement <br /> Task 4: Revegetation <br /> Task 5: Equipment Rental <br /> Task 6: Silt Fence <br /> Task 7: Underdrain Construction <br /> Task 8: Tree Planting <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with specification 1.0, Mobilization/Demobilization, attached. <br /> 6 <br />