My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (199)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (199)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:13:20 AM
Creation date
6/13/2012 10:32:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demobilization <br />Upon completion of the work under this Contract, the CONTRACTOR shall remove all <br />temporary facilities and equipment. The CONTRACTOR shall remove from the work site <br />all rubbish, unused materials, and shall fill and dress all holes and disturbances made <br />for convenience, and leave all areas in good order and condition, subject to the approval <br />of the PROJECT MANAGER. <br />1.3 MEASUREMENT AND PAYMENT <br />No measurement for payment shall be made for mobilization and demobilization. <br />Payment of two - thirds of the lump sum price bid will be made with the first monthly <br />progress payment after completion of the work described above for mobilization. <br />Payment of one -third of the lump -sum price bid will be made with the final progress <br />payment for the work if demobilization has been completed. If the price bid for <br />mobilization and demobilization is greater than 15 percent (15 %) of the total contract <br />price, invoices supporting the mobilization costs will be required before payment is <br />approved. <br />Remobilization <br />If remobilization becomes necessary due to seasonal conditions beyond the <br />CONTRACTOR'S control, remobilization costs will be paid based on documented actual <br />costs. No remobilization payment will be made if delays necessitating remobilization <br />were the CONTRACTOR'S responsibility. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.