will be reflected in a lump sum bid under Item 2 on the Bid <br />Schedule. This lump sum bid will cover all costs for structural <br />demolition and removal of rubble and debris from each work area, <br />described above, to the disposal areas. Payment shall be made as <br />this task is completed and approved by the PROJECT MANAGER. <br />TASK 5 ADDITIONAL DEMOLITION <br />The ripping required to be performed during Task 2, Demolition, may <br />reveal subsurface foundations, footers and other reinforced <br />concrete structures. These subsurface structures shall be removed <br />at the sole discretion of the PROJECT MANAGER. Any such structures <br />encountered shall be demolished to a depth of three feet (3') below <br />ground surface as measured from the ground surface immediately <br />adjacent to the structure. All rubble produced as a result of the <br />demolition of these structures shall be removed to either the West <br />or Central Work Area disposal area. Disposal shall occur as <br />described in Task 2, Demolition. <br />Measurement and Payment <br />Payment shall be made by the cubic yard to be demolished and <br />disposed of. Cubic yardage shall be determined by PROJECT MANAGER <br />and CONTRACTOR prior to initiating demolition. Payment shall be <br />made at the unit price bid in Item 5 of the Revised Bid Schedule. <br />The unit price bid in Item 5 of the Revised Bid Schedule shall <br />cover all costs for structural demolition and removal of rubble and <br />debris from each work area to the disposal areas for subsurface <br />structures discovered as a result of ripping operations. Payment <br />shall be made as this task is completed and approved by the PROJECT <br />MANAGER. Payment for this Task will be made only for the unit <br />price shown under Item 5 of the Revised Bid Schedule. <br />5 <br />