structure. <br />Rubble generated through the demolition process shall be disposed <br />of at the Central Work Area disposal site, which is located <br />immediately south of the demolition corridor. The perimeter of the <br />disposal area shall be marked in the field by PROJECT MANAGER. <br />The rubble generated as a result of the demolition process, <br />including all other rubble, trash and debris, shall be placed <br />against the back wall of the disposal area, and shall be evenly <br />spread at the base of the feature for the length of the disposal <br />area. The rubble shall be placed as tightly as possible within the <br />disposal area. The height of the rubble, upon completion of the <br />disposal process, shall not exceed twenty feet (20') as measured <br />from ground surface at the southern most extent of the disposal <br />area. The disposal area shall be constructed so that upon <br />completion, the side slopes of the rubble do not exceed 5H:1V on <br />the north slope, 4H:1V on the east slope and 3H:1V on the west <br />slope. Rubble shall be deposited in the disposal area in such a <br />manner so that void spaces are minimized, and so that the top of <br />the rubble is level. No piece of rubble or debris may exceed a <br />height of eighteen inches (18 ") above the mean elevation of the <br />surrounding material. <br />Materials targeted for demolition which lie within the footprint of <br />the disposal area do not need to be demolished unless any such <br />material, structure foundation or pad exceeds the height of the <br />rubble which surrounds it upon completion of Task 2, Demolition. <br />East Work Area <br />All concrete, block wall, and asphaltic materials as well as <br />miscellaneous debris and materials located within the designated <br />demolition area will be demolished and transported to the Central <br />Work Area disposal site. At least three significant buildings had <br />been located within this work area. A footer which is not <br />associated with a mapped building has been observed at the eastern <br />portion of the work area. Asphalt has been observed in many <br />portions of the work area. All structures, foundations, pads and <br />footers shall be excavated to a depth of three feet (3') below <br />ground level as measured from ground surface immediately adjacent <br />to each structure. <br />Rubble generated as a result of the demolition in the East Work <br />Area shall be transported to the Central Work Area for disposal. <br />Disposal of the rubble from this work area shall conform to the <br />disposal area construction requirements described in the Central <br />Work Area description, above. <br />Measurement and Payment <br />There will be no measurement for payment. Payment for this task <br />4 <br />