My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (198)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (198)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:14:35 AM
Creation date
6/13/2012 10:32:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid. If the CONTRACTOR plans to furnish a machine other than the minimum FHP listed <br /> on the Invitation and Bid, he must write the FHP of the machine, in ink, under the bid item <br /> on the Invitation and Bid, or include it on the List of Equipment Offered form. <br /> After the successful bidder has furnished evidence of the FHP capacity of the equipment <br /> to be used, the amount bid for Equipment Rental will be modified by reversing the above <br /> procedure to reflect the unit price desired by the CONTRACTOR with a corresponding <br /> reduction in the quantity of hours required. This modified hourly rate and number of <br /> hours will appear on the Purchase Order. <br /> 19.3 EXECUTION <br /> Operators <br /> The equipment shall be furnished complete with competent operating personnel. <br /> Operators shall be qualified to perform all work under this specification in a skillful and <br /> professional manner. The OWNER may, in writing, require the CONTRACTOR to remove <br /> from the work any employee the OWNER deems incompetent or careless. The OWNER <br /> will be the sole judge of the acceptability of any employee. <br /> Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations <br /> of the equipment including proper maintenance. <br /> Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants <br /> and fuel is minimized. <br /> Performance of Work <br /> Supplemental work shall be performed after the general construction work in that <br /> particular area and shall consist of general earthmoving or other finishing work as may <br /> be directed by the PROJECT MANAGER. <br /> All operations under this section will be under the direct supervision of the PROJECT <br /> MANAGER and work under this section shall be performed only as ordered and directed <br /> by the PROJECT MANAGER. The PROJECT MANAGER will designate the work to be <br /> performed and the order in which it is to be done, and WILL inspect all work. The <br /> PROJECT MANAGER will maintain documentation of the work. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.