Laserfiche WebLink
PROJECT WORK DESCRIPTION <br /> PROJECT OVERVIEW <br /> The goal of this project is to accomplish demolition and disposal of all concrete, block <br /> wall and asphaltic materials located within the Project Area. Miscellaneous trash and <br /> debris will be collected and disposed of. Sediment control structures will be erected and <br /> maintained during the project. Map 3, Project Area, delineates the extent of the area <br /> affected by this project. <br /> The work area is generally located within 2,500 feet of the main entry gate. The areas are <br /> accessed via compact dirt road. However, access to some areas is adversely affected <br /> by muddy conditions. <br /> Volumes, distances and areas stated in this document are estimations only. <br /> CONTRACTORS are responsible for verifying all estimations prior to bid submittal. <br /> WORK TASKS <br /> The tasks included in the project are as follows: <br /> Task 1: Mobilization and Demobilization <br /> Task 2: Demolition <br /> Task 3: Silt Fence Installation <br /> Task 4: Equipment Rental <br /> TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This task shall comply with specification 1.0, Mobilization/Demobilization, attached. The <br /> cost of Mobilization and demobilization shall include such items as providing security to <br /> ensure pedestrian and vehicular traffic are well away from the work area should any <br /> foundations be blasted, obtaining appropriate insurance for blasting, should any be <br /> done, locking of the mine gate during the life of the project, and maintenance of a <br /> hazard-free work place. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a <br /> lump sum bid under Item 1 on the Bid Schedule. This lump sum bid will cover all costs <br /> for Mobilization and Demobilization. Payment shall be made as described in <br /> specification 1.0, Mobilization/Demobilization, attached. <br /> 7 <br />