My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-05-14_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1999-05-14_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 7:45:20 PM
Creation date
6/13/2012 9:06:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/14/1999
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St, Room 215 <br /> Denver,Colorado 80203 <br /> Phone:(30 3)866-3567 <br /> FAX 1303)832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> November 23, 1998 RESOURCES <br /> Roy Romer <br /> Governor <br /> MEMO <br /> James S Lochhead <br /> TO: David Buckner Executive Director <br /> Michael B.Long <br /> Division Director <br /> FROM: Steve Renner <br /> RE: Job Tasks <br /> I have consulted with the Attorney General and David Bucknam regarding the scope of your <br /> evaluation of steep slope revegetation at Coal Basin. The following should be addressed in a <br /> detailed report, which will likely be evaluated by opposing counsel as a part of on-going <br /> litigation. <br /> - Evaluate the potential for eventual success of the 1997 Mine 4 Steep Slope Revegetation <br /> project; <br /> - Evaluate the potential for success of the 1998 Steep Slope Revegetation Project (which was not <br /> begun), and evaluate the methodology proposed in the Invitation and Bid. These evaluations are <br /> to be based upon observations of the steep slope revegetation work accomplished at Mine 1 and <br /> adjacent to Road D in 1996. Work in these two areas was accomplished using methods similar <br /> to those required in the 1998 Invitation and Bid. <br /> - Evaluate the cost bid to accomplish the 1998 steep slope revegetation project. <br /> - Comment on the necessity to undertake the steep slope revegetation work proposed in the 1998 <br /> steep slope project, including an opinion of whether it is a required reclamation project under the <br /> Mid-Continent permit application and/or applicable reclamation statutes. These comments <br /> would be based upon permit documents, studies undertaken by IMS in the late 80's,regulatory <br /> requirements and ecologic considerations. <br /> - Reflect upon and rebut the comments of MCR consultants which have been relied upon by <br /> MCR as a basis for objecting to the 1998 steep slope revegetation project. <br /> Cheryl Linden, our Assistant Attorney General, requests that you be able to provide an expert <br /> opinion of the items addressed, including the likelihood of success of the proposed steep slope <br /> revegetation, whether you consider the work accomplished in 1997 and that proposed in the 1998 <br /> steep slope revegetation bid package `experimental', and whether you consider vegetation on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.