Laserfiche WebLink
COAL BASIN/1999 RUN-OFF MAINTENANCE <br /> BID SCHEDULE <br /> PKA-9-1061 <br /> Item Description Quantity* Unit Price Total Cost <br /> (Estimated <br /> total units) <br /> 1 D7H Dozer/215 FHP equivalent w/operator <br /> including mob/demob 8 $ /hr $ <br /> 1a D7H Dozer/215 FHP equivalent w/operator 24 $ /hr $ <br /> 2 416B backhoe/loader or 62 FHP equivalent <br /> w/operator including mob/demob 8 $ /hr $ <br /> 2a 416B backhoe/loader or 62 FHP equivalent <br /> w/operator 24 $ /hr $ <br /> 3 10 cubic yard on/off highway dump truck <br /> w/operator including mob/demob 8 $ /hr $ <br /> 3a 10 cubic yard on/off highway dump truck <br /> w/operator 8 $ /hr $ <br /> 4 12G motor grader or 135 FHP equivalent <br /> w/operator including mob/demob 8 $ /hr $ <br /> 4a 12G motor grader or 135 FHP equivalent <br /> w/operator 16 $ /hr $ <br /> 5 Prefabricated silt fence per lineal foot installed <br /> including mob/demob 100 $ /L.Ft $ <br /> 5a Prefabricated silt fence per lineal foot installed <br /> 100 $ /L.Ft. $ <br /> 6 Straw Bales with rebar per bale installed <br /> including mob/demob 25 $ /bale $ <br /> 6a Straw Bales with rebar per bale installed 25 $ /bale $ <br /> 7 Rip Rap, per specifications, installed <br /> including mob/demob 25 $ /vd3 $ <br /> 7a Rip Rap, per specifications, installed 25 $ /vd3 $ <br /> GRAND TOTAL $ <br /> *For bid evaluation only, quantities are NOT guaranteed <br /> Contractor Date <br /> Signature Phone <br /> Address <br /> Tax ID# <br /> THIS BID SCHEDULE MUST BE RETURNED WITH YOUR BID <br /> Page 1 of 1 Page <br />