Supervision <br /> The CONTRACTOR shall be responsible for the supervision of all mechanical operations of the <br /> equipment including proper maintenance. <br /> Equipment maintenance, fueling and repairs shall be done sot that spilling of lubricants and fuel is <br /> minimized. <br /> Performance of Work <br /> Supplemental work shall be performed after the general construction work in that particular area and shall <br /> consist of general earthmoving or other finishing work as may be directed by the PROJECT MANAGER. <br /> All operations under this section will be under the direct supervision of the PROJECT MANAGER and <br /> work under this section shall be performed only as ordered and directed by the PROJECT MANAGER. <br /> The PROJECT MANAGER will designate the work to be performed and the order in which it is to be done, <br /> and WILL inspect all work. The PROJECT MANAGER will maintain documentation of the work. <br /> Equipment Rental Documentation <br /> At the close of each day's operations during which equipment rental work has been conducted under this <br /> specification,the PROJECT MANAGER shall prepare a form entitled "Equipment Rental Record" listing <br /> the date,times and total hours (computed to the nearest one-half hour), each piece of equipment was <br /> operated in accordance with this specification. The PROJECT MANAGER will obtain the signature of the <br /> CONTRACTOR on the form. <br /> "Operation" means that time spent in performing work as well as time necessary for moving equipment <br /> around the work site when directed by the PROJECT MANAGER. However, "operation"does not include <br /> that time spent in transporting the equipment to the initial work site, removing the equipment when all work <br /> had been completed,transporting the equipment away from and returning it to the work site in the event of <br /> a temporary or seasonal suspension of operation, maintenance of the equipment, any time during which <br /> the equipment is "bogged down"or otherwise not working, nor for any periods when operations are <br /> suspended by the PRINCIPLE REPRESENTATIVE. <br /> 19.4 MEASUREMENT AND PAYMENT <br /> The number of hours each piece and type of equipment used as directed by the PROJECT MANAGER <br /> under this specification will be counted to the nearest one-half hour. Payment will be made at the unit <br /> price established by the Invitation and Bid Sheet and in the purchase order contract for supplemental <br /> earthwork for each piece and type of equipment. Such payment shall include the cost of all materials, <br /> accessories, labor, maintenance, operating supplies, salaries of operators, and any other expenses <br /> incidental to the operation of the equipment in the performance of work in accordance with this <br /> specification and bid item(s). No extra payment will be made for the use of the same equipment while <br /> performing work on other bid items on the Invitation and Bid Sheet, Bid Schedules or Purchase Order <br /> Contract. No additional payment will be made for hauling equipment to or away from the work site except <br /> as may be proper under Mobilization/Demobilization. <br /> 5 <br />