My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (202)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (202)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:21:40 AM
Creation date
6/13/2012 8:28:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(18") centers. Ripping shall occur perpendicular to the fall of the slope at any one location. <br /> Small undulations will be built on the ground surface in this area following topsoil application. <br /> These features will be constructed in lieu of the severe surface roughening described in Task 10, <br /> Topsoil Application and Surface Roughening. These undulations will be approximately twelve <br /> feet (12') in length and two feet (2') in height. A crest of at least one foot (1') will be created. <br /> Side slopes shall be no steeper than 2.5HA V. Thirty such hills shall be created in a random <br /> pattern throughout this area. <br /> Area North of Coal Refuse Pile <br /> This area will be graded so that a slight gradient to the north is created, causing rain fall and <br /> snow melt to drain as sheet flow north toward Coal Creek. Some cut of the southern Coal Creek <br /> embankment may be necessary to achieve the required fall. The entire area will be ripped to <br /> twelve inches (12") depth on eighteen inch (18") centers. Ripping shall occur perpendicular to <br /> the fall of the slope at any one location. Following ripping and topsoil application, small <br /> undulations will be built on the ground surface in this area for a distance of seventy five feet (75') <br /> from the toe of the coal refuse pile slope. No such features will be constructed between this <br /> seventy five feet boundary and the crest of Coal Creek to the north. These features will be <br /> constructed in lieu of the severe surface roughening described in Task 10, Topsoil Application <br /> and Surface Roughening. These undulations will be approximately twelve feet (12') in length and <br /> two feet (2') in height. A crest of at least one foot (1') will be created. Side slopes shall be no <br /> steeper than 2.51-1:1 V. Thirty such hills shall be created in a random pattern throughout this area. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br /> bid under Item 8 on the Bid Schedule. This lump sum bid will cover all costs for removal of <br /> stockpiled topsoil, distribution of topsoil onto the affected areas of the Project Area, roughening <br /> of soil. Such payment shall be considered full compensation for all labor, materials, equipment <br /> and all other items necessary and incidental to the placement of topsoil as directed and <br /> described in the specifications. Payment for this task will be made only for the unit price shown <br /> under Item 8 of the Bid Schedule. Payment shall be as this task is completed and approved by <br /> the PROJECT MANAGER. <br /> TASK 9 TOPSOIL APPLICATION AND SURFACE ROUGHENING <br /> Topsoil will be applied to most of the areas disturbed during completion of this Project. Areas to <br /> be topsoiled include the Upper and Lower Sutey access roads, the Ditch 8 area, the coal refuse <br /> pile located at the former location of the wash plant, the Old Coal Stockpile area located near the <br /> second switchback of Road A, and all other areas affected during Task 8, Earth Work. <br /> NOTE that topsoil application at the Upper and Lower Sutey access roads is to be accomplished <br /> during completion of Task 4, Road Grading. Topsoil application specifications for these two <br /> areas are contained in this Task description, and payment will also be made under this Task. <br /> Topsoil application of the area adjacent to Ditch 8 (areas outside of the Ditch 8 liner) will be <br /> described, measured and paid under this Task. <br /> Upon completion and PROJECT MANAGER approval of Task 8, Earth Work, and any other <br /> tasks which must be accomplished prior to topsoil application, topsoil will be applied to the <br /> various features subject to this Project. Topsoil will be derived from the topsoil stockpile located <br /> immediately west of the Sutey Topsoil Stockpile (Map 3, Project Area). <br /> 18 <br />