TASK 1 MOBILIZATION AND DEMOBILIZATION <br /> This Task shall comply with Specification 1.0, Mobilization/ Demobilization, attached. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump sum <br /> bid under Item 1 on the Bid Schedule. This lump sum bid will cover all costs fort Mobilization and <br /> Demobilization. Payment shall be made as described in Specification 1.0, Mobilization / <br /> Demobilization, attached. <br /> TASK 2 DEMOLITION <br /> The goal of this Task is to accomplish demolition and disposal of a concrete drainage ditch and <br /> an adjacent retaining wall, disposal of steel debris, trash, tires and other miscellaneous materials <br /> encountered within the Project Area. <br /> A small amount of steel debris, tires, and other materials are located near the main entry gate. A <br /> small amount of steel debris, other materials and trash may be encountered ear the Rock Tunnel <br /> vicinity. These materials, as well as any other debris encountered within the Project Area will be <br /> collected and removed from the site. CONTRACTOR may either keep these materials, or shall <br /> properly dispose of them in a licensed disposal facility. <br /> Adjacent to Coal Creek is a concrete lined ditch and retaining wall. The ditch and wall extend <br /> east from the vicinity of a large steel building to the Dutch Creek Diversion. There are three (3) <br /> short concrete lateral ditches, which feed into the main concrete ditch. These structures shall be <br /> completely removed and placed with the other concrete rubble in the designated disposal area. <br /> Concrete debris must not be allowed to enter into Coal Creek. No debris or rubble may remain in <br /> place on the slope above Coal Creek. <br /> A large culvert is in place under the Main Sutey access road near the confluence of Ditches 1 <br /> and 8, immediately south of the Sutey Refuse Pile. This culvert is anchored by a concrete <br /> structure at the outlet, and possibly by a concrete footer at the inlet. Other concrete structures <br /> are also located near the outlet of this culvert at the margin of the adjacent pond. <br /> CONTRACTOR shall accomplish demolition and disposal of all concrete structures, including <br /> footers, if any, near and adjacent to the culvert during completion of Task 2, Demolition. <br /> Concrete structures at the Coal Basin Mine have been observed to contain substantial amounts <br /> of rebar. It is assumed that the various structures described here are similarly rebared. <br /> The demolished concrete, including rebar, will be transported to a disposal area located on top of <br /> the coal refuse disposal area, approximately one hundred and fifty feet (150') south of the <br /> concrete ditch. PROJECT MANAGER will mark the location of the disposal area in the field prior <br /> to demolition being initiated. A hole shall be excavated in the refuse, and the demolished <br /> concrete rubble will be placed so that when buried a minimum of four feet (4') of refuse shall <br /> cover the rubble. Upon completion, excess excavated refuse shall be replaced and compacted. <br /> The surface of the disposal area shall be reshaped to achieve the same contour as existed at the <br /> top of the facility prior to initiating rubble disposal activities. <br /> 9 <br />