Laserfiche WebLink
Table 3 <br />Transit Mix - Grisenti Gravel Pits <br />Replacement Sources (2011 -2013) <br />(all values in acre -feet) <br />Notes: <br />[1] Total Mining Depletions from Table 1, column [10]. <br />[2] Historical Irrigation Credit from Table 2, columns [12] and [13]. Negative values represent historic stream accretions. <br />[3] Replacement Requirements equal [1] - [2] if positive else, zero. <br />[4] Excess credits equal [2] - [1] if positive else, zero. <br />[5] Twin Lakes Release Requirement includes a 7.81% Transit loss based upon a loss of 0.07% per mile over 111.6 miles. <br />B171'l H \9107 - Transit Mix\08 - Grisenti\SWSP Tables 2011 xlsx 3- Replace <br />mater co-ulranrs BISIIOr GROG PEN ASSOCIATL S. INC 2/3 /2011 239 PM JAK <br />Total <br />Historical <br />Remaining <br />Twin Lakes <br />Mining <br />Irrigation <br />Replacement <br />Excess <br />Release <br />Depletions <br />Credits <br />Requirements <br />Credits <br />Requirements <br />Month <br />P] <br />[2 ] <br />[3 <br />4 <br />5 <br />Feb -11 <br />3.00 <br />-1.43 <br />4.43 <br />4.81 <br />Mar -11 <br />4.05 <br />-1.38 <br />5.43 <br />5.90 <br />Apr -11 <br />6.08 <br />7.76 <br />1.68 <br />May -I 1 <br />8.06 <br />22.34 <br />14.28 <br />Jun -11 <br />10.45 <br />23.49 <br />13.04 <br />Jul -11 <br />10.04 <br />26.59 <br />16.55 <br />Aug -11 <br />11.00 <br />18.42 <br />7.43 <br />Sep -11 <br />9.04 <br />13.71 <br />4.67 <br />Oct -11 <br />6.37 <br />11.28 <br />4.91 <br />Nov -11 <br />3.77 <br />-4.24 <br />8.01 <br />8.69 <br />Dec -11 <br />3.18 <br />-2.47 <br />5.65 <br />6.13 <br />Jan -12 <br />3.27 <br />-1.90 <br />5.17 <br />5.60 <br />11 -12 Total <br />78.31 <br />112.17 <br />28.70 <br />62.56 <br />31.13 <br />Feb -12 <br />3.59 <br />-1.43 <br />5.03 <br />5.46 <br />Mar -12 <br />4.93 <br />-1.38 <br />6.31 <br />6.85 <br />Apr -12 <br />7.57 <br />7.76 <br />0.19 <br />May -12 <br />10.12 <br />22.34 <br />12.22 <br />Jun -12 <br />13.22 <br />23.49 <br />10.27 <br />Jul -12 <br />12.68 <br />26.59 <br />13.91 <br />Aug -12 <br />11.00 <br />18.42 <br />7.43 <br />Sep -12 <br />9.04 <br />13.71 <br />4.67 <br />Oct -12 <br />6.37 <br />11.28 <br />4.91 <br />Nov -12 <br />3.77 <br />-4.24 <br />8.01 <br />8.69 <br />Dec -12 <br />3.18 <br />-2.47 <br />5.65 <br />6.13 <br />Jan -13 <br />3.27 <br />-1.90 <br />5.17 <br />5.60 <br />12 -13 Total <br />88.74 <br />112.17 <br />30.17 <br />53.61 <br />32.73 <br />Notes: <br />[1] Total Mining Depletions from Table 1, column [10]. <br />[2] Historical Irrigation Credit from Table 2, columns [12] and [13]. Negative values represent historic stream accretions. <br />[3] Replacement Requirements equal [1] - [2] if positive else, zero. <br />[4] Excess credits equal [2] - [1] if positive else, zero. <br />[5] Twin Lakes Release Requirement includes a 7.81% Transit loss based upon a loss of 0.07% per mile over 111.6 miles. <br />B171'l H \9107 - Transit Mix\08 - Grisenti\SWSP Tables 2011 xlsx 3- Replace <br />mater co-ulranrs BISIIOr GROG PEN ASSOCIATL S. INC 2/3 /2011 239 PM JAK <br />