Laserfiche WebLink
Table 4 <br />Transit Mix - Grisenti Gravel Pits <br />Accounting Form (2011 -2013) <br />Notes: <br />[1] Transit Mix's actual production; limited in SWSP to 260,000 tons annually. <br />[2] Based upon 4 percent water loss by weight, [1] * 0.04 * 0.00074 * 1000. <br />[3] Water use based upon end -of -month meter readings reported by Transit Mix. <br />[4] Net Evaporation based upon the SWSP. <br />[5] Based upon measured area by Transit Mix. <br />[6] Equals [4] * [5]. <br />[7] Total depletion equals [2] + [3] + [6]. <br />[8] Based on Historic Irrigation Credits/Debits from BBA analysis. <br />[9] Equals [7] - [8] if [8] is less than [7], else zero. <br />[10] Twin Lakes Release Requirement includes a 7.81% transit loss based upon a loss of 0.07% per mile and a distance of 111.6 miles. <br />[11] Actual replacement deliveries to the Phase 1 pond measured through a 2 -foot rectangular weir by a continuous recorder. Deliveries include Lester- Attebery Ditch water <br />and Twin Lakes reservoir water. <br />[12] Net replacement balance for the Grisenti Pit equals the minimum of the historical irrigation credit and the ditch delivery to the Phase 1 pond minus the total mining depletion <br />plus the remaining replacement requirement (which is replaced by the Twin Lakes release). <br />BBA H \9107 -Transit Mix \08 - Grisenb\SWSP Tables 2011.xlsx 4 -Acct <br />a•atcrconsultan[s B157- fOP- I3RPGL ?ZN ASSOC/iiTIS, !A'C 2/4/2011 2:31 PM JAK <br />Depletions <br />Historical <br />Replacement Requirements <br />Ditch <br />Replacement <br />Production <br />Dust Control <br />Exposed <br />Net <br />Total <br />Remaining <br />Twin Lakes <br />Irrigation <br />Deliveries <br />Balance <br />Mined <br />Water <br />Meter <br />Water <br />Net <br />Ground <br />Evaporation <br />Mining <br />Credit ( +)/ <br />Replacement <br />Release <br />to Phase 1 <br />Credit ( +)/ <br />Material <br />Consumed <br />Reading <br />Use <br />Evaporation <br />Water <br />Volume <br />Depletion <br />Debit ( -) <br />Requirement <br />Requirement <br />Pond <br />Debit ( -) <br />(tons) <br />(ac -ft) <br />(gallons) <br />(ac -ft) <br />(ft) <br />(acres) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />(ac -ft) <br />Month <br />[11 <br />r2l <br />3 <br />4 <br />5 1 <br />[61 <br />r7l <br />8 <br />9 <br />10 <br />11 <br />12 <br />Feb <br />0.00 <br />0.00 <br />0.36 <br />0.00 <br />0.00 <br />22.34 <br />Mar <br />0.00 <br />0.00 <br />0.49 <br />0 *! <br />0.00 <br />0.00 <br />23.49 <br />Apr <br />0.00 <br />0.00 <br />0.46 <br />:;;'rk ?'a #' <br />0.00 <br />0.00 <br />26.59 <br />May <br />0.00; <br />0.00 <br />0.40 <br />Q�, <br />0.00 <br />0.00 <br />18.42 <br />Jun <br />0.00 <br />' <br />0.00 <br />0.32 <br />0.00 <br />0.00 <br />13.71 <br />Jul <br />0.00 <br />0.00 <br />0.21 <br />; . 2 " • <br />0.00 <br />0.00 <br />11.28 <br />Aug <br />0.00= <br />0.00 <br />0.11 <br />'<�:�: � gip: <br />0.00 <br />0.00 <br />-4.24 <br />Sep <br />0.00 <br />r <br />0.00 <br />0.08"ti <br />=.,'' <br />0.00 <br />0.00 <br />-2.47 <br />Oct <br />0.00 <br />0.00 <br />0.09 <br />0.00 <br />0.00 <br />-1.90 <br />Nov <br />0.00 <br />0.00 <br />0.10 <br />A;rr "•t,;; <br />0.00 <br />0.00 <br />-1.43 <br />Dec <br />0.00 <br />0.00 <br />0.15:, <br /><`' °i. <br />0.00 <br />0.00 <br />-1.38 <br />Jan <br />0.00 <br />0.00 <br />0.09 <br />t "Z`. <br />0.00 <br />0.00 <br />7.76 <br />Total <br />0 <br />0.00 <br />0.00 <br />2.86 <br />- <br />0.00 1 <br />0.00 <br />112.17 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Notes: <br />[1] Transit Mix's actual production; limited in SWSP to 260,000 tons annually. <br />[2] Based upon 4 percent water loss by weight, [1] * 0.04 * 0.00074 * 1000. <br />[3] Water use based upon end -of -month meter readings reported by Transit Mix. <br />[4] Net Evaporation based upon the SWSP. <br />[5] Based upon measured area by Transit Mix. <br />[6] Equals [4] * [5]. <br />[7] Total depletion equals [2] + [3] + [6]. <br />[8] Based on Historic Irrigation Credits/Debits from BBA analysis. <br />[9] Equals [7] - [8] if [8] is less than [7], else zero. <br />[10] Twin Lakes Release Requirement includes a 7.81% transit loss based upon a loss of 0.07% per mile and a distance of 111.6 miles. <br />[11] Actual replacement deliveries to the Phase 1 pond measured through a 2 -foot rectangular weir by a continuous recorder. Deliveries include Lester- Attebery Ditch water <br />and Twin Lakes reservoir water. <br />[12] Net replacement balance for the Grisenti Pit equals the minimum of the historical irrigation credit and the ditch delivery to the Phase 1 pond minus the total mining depletion <br />plus the remaining replacement requirement (which is replaced by the Twin Lakes release). <br />BBA H \9107 -Transit Mix \08 - Grisenb\SWSP Tables 2011.xlsx 4 -Acct <br />a•atcrconsultan[s B157- fOP- I3RPGL ?ZN ASSOC/iiTIS, !A'C 2/4/2011 2:31 PM JAK <br />