Laserfiche WebLink
Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />(min) <br />1 <br />10560.00 <br />8.00 <br />3.00 <br />11.00 <br />1018 <br />10.386 <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />1 <br />10560.00 <br />-8.00 <br />3.00 <br />-5.00 <br />2938 <br />3.705 <br />Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Task # 225 <br />Return Route: <br />Haul Time: <br />Return Time: <br />10.386 minutes <br />3.705 <br />minutes <br />Total Truck Cycle Time: 16.159 minutes <br />Page 3 of 3 <br />Loading Tool unit <br />Production 542.24 LCY/Hour Adjusted for job efficiency: 450.06 LCY /Hour <br />Truck Unit Production <br />39.21 LCY /Hour Adjusted for job efficiency: 32.54 LCY/Hour <br />Optimal No. of Trucks: 14 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />Adjusted hourly truck team production: 130.17 LCY /Hour <br />Adjusted single truck/loader team production: 130.17 LCY /Hour <br />Adjusted multiple truck/loader team production: 130.17 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 136.56 Hours <br />Unit cost: $6.026 /LCY Total job cost: $107,119.33 <br />CIRCES Cost Estimating Software <br />