My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:58:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 2 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip RPEE roads <br />Site: West Elk Mine <br />PROJECT IDENTIFICATION <br />Task #: 226 State: Colorado Abbreviation: None <br />Date: 9/14/2011 County: Gunnison Filename C007 -226 <br />User: TAK <br />Cost Breakdown: <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9R - 9SU (2005) <br />Ripper Attachment: 3 -Shank Ripper <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: $854.35 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA BCY NA <br />Area: 11 acres Rip Depth (ft): 4.00 Volume: 71,116 BCY or CCY <br />Source of estimated quantity: 3.03 miles of road, 30 ft wide <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: 0.646 Acres /hr <br />Adjusted Hourly Unit Production: 0.54 Acres /hr <br />Adjusted Hourly Fleet Production: 2.14 Acres /hr <br />JOB TIME AND COST <br />Fleet size: 4 Grader(s) Total job time: 5.14 Hours <br />Unit cost: $398.588 Per acre <br />Permit Action: Permit Renewal RN- <br />06 Permit/Job #: C 1980007 <br />$57.16 <br />$110.89 <br />$7.05 <br />$38.49 <br />$213.59 <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />NA feet/second <br />2.63 mph <br />7.67 degrees <br />50.00 feet <br />88.00 feet <br />0.25 feet <br />0.646 acres /hour <br />Site Altitude: 6,300 feet <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Total job cost: $4,392.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.