My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:37:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 1 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
205 <br />206 <br />207 <br />208 <br />209 <br />210 <br />211 <br />212 <br />213 <br />214 <br />215 <br />216 <br />217 <br />218 <br />219 <br />220 <br />221 <br />223 <br />224 <br />225 <br />226 <br />227 <br />228 <br />229 <br />301 <br />302 <br />303 <br />304 <br />305 <br />306 <br />307 <br />308 <br />309 <br />310 <br />311 <br />312 <br />313 <br />314 <br />315 <br />Remove RPE ponds - Haul fill to top of refuse pile <br />SCRAPER1 <br />- -4 - 7 7 -4 ---4 - 7t 7 -4 --- -4 -4 -4 <br />32.80 <br />Rip RPE road <br />RIPPER <br />0.11 <br />Regrade access road from Sylvester Gulch Rd to <br />office <br />EXCAVATE <br />14.65 <br />Regrade RPE sediment control ditches <br />DOZER <br />3.98 <br />Compact RPE road backfill <br />COMPACT <br />2.66 <br />Haul remaining waste rock from prep. plant to <br />RPEE <br />TRUCK1 <br />66.12 <br />Grade remaining coal waste rock into <24" lifts on <br />RPEE <br />DOZER <br />4.24 <br />Replace topsoil from stockpile to RPE ponds <br />TRUCK1 <br />7.14 <br />Replace topsoil from stockpile to RPE road <br />TRUCK1 <br />1.58 <br />Regrade NSS pond <br />DOZER <br />0.40 <br />Regrade NSS area <br />DOZER <br />16.91 <br />Regrade NSS area entrance road <br />DOZER <br />0.07 <br />Replace topsoil from stockpile to NSS area <br />DOZER <br />7.36 <br />Regrade Box Canyon north monitoring well pad <br />(TR -113) <br />DOZER <br />0.27 <br />Rip road and auger drill sites <br />RIPPER <br />0.27 <br />Regrade light use road and auger rig drill sites <br />(MR -354) <br />DOZER <br />0.81 <br />Haul topsoil from RPEE soil storage areas to <br />RPEE <br />TRUCK1 <br />143.86 <br />Reveg RPE (16.5 ac), NSS Area (6.2 ac), and <br />RPEE (89 ac) <br />REVEGE <br />223.40 <br />Grade RPEE ditches to final configuration <br />DOZER <br />0.61 <br />Remove RPEE road surfacing, haul to main <br />surface facilities <br />TRUCK1 <br />136.56 <br />Rip RPEE roads <br />RIPPER <br />5.14 <br />Grade RPEE haul roads to AOC <br />DOZER <br />36.10 <br />Haul topsoil from RPEE soil storage to reclaimed <br />RPEE roads <br />TRUCK1 <br />206.50 <br />Regrade upper light -use road on RPE, MR -356 <br />DOZER <br />0.07 <br />Demolish/remove structures: Slyvester G., Shaft <br />#3, Syl. G. <br />DEMOLISH <br />311.03 <br />Rip substation road <br />RIPPER <br />0.02 <br />Regrade main access road to substation <br />DOZER <br />2.24 <br />Rip Sylvester Gulch fan pad and road <br />RIPPER <br />0.26 <br />Backfill Sylvester Gulch fan pad <br />DOZER <br />1.04 <br />Backfill SGFA ventilation shaft #3 <br />DOZER <br />0.00 <br />Replace topsoil f/ stockpile to Shaft #3 pad & light <br />use rd. <br />SCRAPER1 <br />13.50 <br />Regrade shaft #3 pad and roads <br />DOZER <br />381.37 <br />Compact backfilled material at Shaft #3 pad and <br />roads <br />COMPACT <br />149.81 <br />Rip shaft #3 and roads <br />RIPPER <br />1.25 <br />Haul Shaft #3 backfill from Shafts #1 & #2 (Task <br />228, PR -7) <br />TRUCK1 <br />564.72 <br />Pull up material from Sylvester G. Light Use Road <br />Expansion <br />EXCAVATE <br />26.47 <br />Regrade material at Sylvester Gulch light -use road <br />upgrade <br />DOZER <br />2.71 <br />Replace topsoil f/ stockpile to fill light use rd. <br />expansion <br />SCRAPERI <br />0.73 <br />Compact backfill on widened portion of Syl. G. <br />COMPACT <br />5.47 <br />Cost Summary Worksheet Cont'd <br />Task # AAA <br />Page 3 of 8 <br />$20,161.00 <br />$98.00 <br />$2,042.00 <br />$3,401.82 <br />$420.00 <br />$51,865.55 <br />$3,625.34 <br />$5,603.18 <br />$1,236.63 <br />$345.23 <br />$14,446.26 <br />$60.26 <br />$6,287.58 <br />$230.00 <br />$239.00 <br />$689.28 <br />$112,852.94 <br />$663,077.45 <br />$520.36 <br />$107,119.33 <br />$4,392.00 <br />$30,837.98 <br />$84,239.07 <br />$62.66 <br />$622,061.46 <br />$25.00 <br />$1,917.15 <br />$230.00 <br />$885.74 <br />$4.16 <br />$8,294.51 <br />$325,823.44 <br />$23,588.00 <br />$1,075.00 <br />$477,809.87 <br />$3,690.00 <br />$2,315.31 <br />$449.77 <br />$862.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.