My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-09_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2011-10-09_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:54 PM
Creation date
6/12/2012 2:37:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/9/2011
Doc Name
Reclamation Cost Estimate (Part 1 of 3)
From
DRMS
Type & Sequence
RN6
Email Name
JRS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />048 <br />050 <br />051 <br />052 <br />053 <br />054 <br />055 <br />056 <br />057 <br />058 <br />059 <br />061 <br />062 <br />063 <br />067 <br />070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />201 <br />202 <br />203 <br />204 <br />Push west fill to base of cut slope bench <br />DOZER <br />- •--i - rr •--i -. d - , t *I ..■ '7 .--i .-. .-- .-. <br />29.85 <br />Push fill material back on to cut slope <br />DOZER <br />30.88 <br />Move fill material from portal storage bench to <br />base of cut <br />DOZER <br />9.18 <br />Move portal storage bench material on to cut slope <br />DOZER <br />7.13 <br />Compact fill replaced material at MSB excavation <br />site <br />COMPACT <br />19.84 <br />Rip storage bench access road <br />RIPPER <br />0.16 <br />Rip portal access road <br />RIPPER <br />0.21 <br />Rip Materials Storage Bench <br />RIPPER <br />1.31 <br />Replace topsoil from stockpile to materials storage <br />bench <br />SCRAPER1 <br />30.87 <br />Replace topsoil from stockpile #5 to MSB cutslope <br />SCRAPER1 <br />7.88 <br />Replace topsoil from stockpile #5 to west fill area <br />SCRAPER1 <br />2.72 <br />Rip Truck Pull -out Lane <br />RIPPER <br />0.03 <br />Regrade mine access road from office to portals <br />EXCAVATE <br />26.66 <br />Rip Main Surface Facilities Area <br />RIPPER <br />4.67 <br />Backfill /grade shop and warehouse area <br />DOZER <br />3.60 <br />Backfill /grade office/bathhouse area <br />DOZER <br />7.47 <br />Backfill /grade parking lot <br />DOZER <br />10.88 <br />Backfill Ponds MB -1 and FW -1 <br />DOZER <br />1.02 <br />Regrade Pond MB -1 <br />DOZER <br />30.10 <br />Regrade Pond MB -1 <br />DOZER <br />16.59 <br />Regrade Pond MB -3 <br />DOZER <br />2.48 <br />Regrade diversion ditches DCW -1A, DCW -1B, <br />and D1 -6 <br />EXCAVATE <br />13.23 <br />Regrade all sediment ditches <br />EXCAVATE <br />1.30 <br />Rip new light use and access roads <br />RIPPER <br />0.43 <br />Regrade Middle Mine Facilities Road <br />EXCAVATE <br />10.81 <br />Distribute Main Topsoil Stockpile <br />SCRAPER1 <br />132.78 <br />Spread topsoil on parking lot expansion, approved <br />MR -217 <br />DOZER <br />0.79 <br />Finish grade backfilled areas <br />DOZER <br />17.04 <br />Rip expanded mine entrance area <br />RIPPER <br />0.14 <br />Regrade mine entrance expansion area <br />DOZER <br />1.15 <br />Replace topsoil f/stockpile to add'l disturb. at mine <br />entran <br />TRUCK1 <br />1.97 <br />Rip Bear #1 Mine area (Pond MB -5E) <br />RIPPER <br />1.79 <br />Haul Bear Mine area riprap stockpile to base of fill <br />TRUCK1 <br />4.98 <br />Dispose of remaining stockpiled brush on Bear <br />Mine bench <br />TRUCK1 <br />8.99 <br />Regrade access road from Sylvester Gulch Rd to <br />office <br />EXCAVATE <br />20.07 <br />Rip access road from Hwy 133 to Sylvester Gulch <br />Road <br />RIPPER <br />0.21 <br />Regrade haul/access road from Hwy 133 to Syl. <br />Gulch Fan Rd. <br />DOZER <br />8.20 <br />Regrade sewage treatment pond <br />DOZER <br />0.02 <br />Regrade P -2 conveyor bench <br />DOZER <br />4.30 <br />Regrade Pond MB -5E <br />DOZER <br />11.86 <br />Demolish/remove structures in RPE, ERPE, and <br />NS SA <br />DEMOLISH <br />37.40 <br />Compact remaining refuse at RPEE <br />COMPACT <br />9.32 <br />Haul cover material to RPE area <br />TRUCK1 <br />78.20 <br />Regrade RPE sediment control ditches <br />DOZER <br />0.26 <br />Cost Summary Worksheet Cont'd <br />Task # AAA <br />Page 2 of 8 <br />$25,500.05 <br />$26,377.98 <br />$7,846.53 <br />$6,087.23 <br />$3,124.00 <br />$144.00 <br />$184.00 <br />$1,121.00 <br />$18,970.86 <br />$4,840.79 <br />$1,670.34 <br />$31.00 <br />$3,717.00 <br />$3,994.00 <br />$3,078.58 <br />$6,382.84 <br />$9,298.10 <br />$870.27 <br />$25,713.21 <br />$14,172.70 <br />$2,114.99 <br />$1,845.00 <br />$182.00 <br />$372.00 <br />$1,508.00 <br />$81,603.66 <br />$672.45 <br />$14,561.82 <br />$123.00 <br />$983.61 <br />$1,667.29 <br />$1,536.00 <br />$4,217.42 <br />$5,943.87 <br />$2,799.00 <br />$184.00 <br />$7,009.08 <br />$19.90 <br />$3,674.05 <br />$10,136.34 <br />$74,858.06 <br />$1,468.00 <br />$61,345.23 <br />$217.87 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.