Laserfiche WebLink
TC -1 conveyor <br />7x350 if <br />Conveyor, overland, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />350.00 <br />LF <br />$25.36 <br />$8,876.00 <br />-Bent foundation <br />8x2x4 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />64.00 <br />SF <br />$3.22 <br />$206.08 <br />PR -2 conveyor - <br />Superstructure <br />10x2000 if <br />Conveyor, overland, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />2,000.00 <br />LF <br />$25.36 <br />$50,720.00 <br />-Bent foundations <br />160x6x4 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />3,840.00 <br />SF <br />$3.22 <br />$12,364.80 <br />-Micro piles <br />240x2x2 <br />Demo. and on -site <br />disposal in excavated <br />pit, 1.5 ft. x 3 ft. - Max. <br />200 ft. push <br />960.00 <br />LF <br />$14.47 <br />$13,891.20 <br />- Take -up tower <br />24x20x80 <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />38,400.00 <br />CF <br />$0.21 <br />$8,102.40 <br />TC- 1 /PR -2 transfer <br />structure <br />20x20x40 <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />16,000.00 <br />CF <br />$0.21 <br />$3,376.00 <br />- Foundation <br />20x20x 12 in <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />400.00 <br />SF <br />$3.22 <br />$1,288.00 <br />P -6 conveyor <br />8x10x200 if <br />Conveyor, overland, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />200.00 <br />LF <br />$25.36 <br />$5,072.00 <br />PP -4 conveyor <br />8x10x550 if <br />Conveyor, overland, <br />including supports - 8 <br />ft. W x 10 ft. H housing <br />550.00 <br />LF <br />$25.36 <br />$13,948.00 <br />-Bent foundations <br />10x2x4 <br />Demo. and on -site <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />80.00 <br />SF <br />$3.22 <br />$257.60 <br />Shaft 3 exhaust fan <br />(MR -337)- <br />Superstructure <br />120x20x10 <br />Bldg. (SN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />24,000.00 <br />CF <br />$0.18 <br />$4,392.00 <br />-Floor <br />130x31x8 in <br />Demo. and on -site <br />disposal in excavated <br />pit, 8 in. thick - Max. <br />200 ft. push <br />4,030.00 <br />SF <br />$2.14 <br />$8,624.20 <br />- Footings <br />2x3 <br />Demo. and on -site <br />disposal in excavated <br />pit, 2.0 ft. x 3 ft. - Max. <br />200 ft. push <br />280.00 <br />LF <br />$19.30 <br />$5,404.00 <br />FW -2 pond HDPE <br />pipe (MR -371) <br />830 ft X 8" <br />diam <br />Pipe, corrugated metal <br />(CMP) - 8 in diameter <br />pipe <br />830.00 <br />LF <br />$1.65 <br />$1,369.50 <br />- Walkway extension <br />(MR -371) <br />4x12x12 <br />Bldg. (MN) demo. /on- <br />site disposal in <br />excavated pit - Max. <br />200 ft. push <br />576.00 <br />CF <br />$0.20 <br />$114.05 <br />Demo Worksheet Cont'd <br />Task # TTT <br />Page 18 of 19 <br />CIRCES Cost Estimating Software <br />